Free Contractor Quote Generator: No Sign-Up, Save as PDF

A contractor quote is not a one-line price. It is a labour breakdown, a materials list, subcontractor costs, a markup, a permit line, a deposit, and a validity date — and if any of those are missing, the client compares your number against a rival's and guesses at the difference. A free contractor quote generator builds all of that in minutes: you type the job in, the maths is done for you, and you download a clean PDF to send the same day. No sign-up, no account, no watermark.

This guide walks you through our free quote generator step by step, shows you exactly what a contractor quote must include, and works through a full bathroom remodel quote with every figure hand-computed — so you can check the maths yourself before you trust any tool with it.

Why a generator beats a template for contractors

Our free quote template for Google Docs is a solid starting point for a simple quote. If you prefer to build the quote in Microsoft Word instead, our contractor quote template for Word shows the full build — tables, =SUM(ABOVE) formulas, and PDF export. But contractor quotes are rarely simple, and that is where a template starts to cost you time:

If your quote is a handful of lines and never changes, the template is fine. If it has materials, subcontractors, and a markup — which is most contractor work — use the generator.

How to use the free contractor quote generator, step by step

Open our free quote generator. There is no sign-up and nothing to install; it works in your browser, on a phone or a desktop.

1. Add your business details

Enter your business name, address, phone, and email. Add your logo if you have one. These details are saved in your browser, so you only type them once — the next quote starts with them already filled in.

2. Add the client and the job

Enter the client's name and address, plus the site address if it is different (common on renovation work). Give the quote a number — sequential numbers like QT-2026-014 make it easy to reference later — and set the date and a validity date. For contractor work, keep validity short: 7 to 14 days is standard, because material prices move fast.

3. Add your line items — labour, materials, subcontractors

This is the part that makes a contractor quote different from a freelancer's. Add one line per item, with a quantity and a unit price:

The generator calculates each line amount and keeps a running subtotal as you type.

4. Add your markup and tax

Contractors make their profit on markup, not just on labour. Set your markup as a percentage — the worked example below uses 10% on direct costs — and the generator applies it. For tax, enter the rate that applies in your state. In most US states, a contractor on a lump-sum contract is treated as the end consumer of the materials: you pay sales tax when you buy them and do not charge the client sales tax on the quote. A smaller group of states taxes construction services or labour — including Hawaii, New Mexico, South Dakota, and Washington — so check your own state's rules before you add a tax line. Our guide to US sales tax on invoices covers the details.

5. Set the deposit and terms

State the deposit on the quote itself — 30–50% upfront is standard for contractor work, because you are buying materials before you start. Add your terms: what is included, what is excluded, how change orders are priced, and when the balance is due. For milestone-based deposits and how to bill each one, see our guide to how to invoice for a deposit.

6. Download the PDF and send it

Click download and save the PDF. Send it to the client by email with the quote number and total in the subject line, so it is easy to find later. Keep your own copy, and when the client accepts, turn the same details into an invoice with our free invoice generator — the numbers should match the quote exactly.

What every contractor quote must include

| Section | What to put | Why it matters | | --- | --- | --- | | Header | Your business name, address, phone, email, logo | Proves you are a real business | | Header | Quote number, date, valid-until date | Lets both sides reference the quote; stops old prices being honoured months later | | Client | Client name, billing address, site address | The site address matters when the job is at a different property | | Labour | Each task, hours, hourly rate | Shows the client what the work costs, not just a lump sum | | Materials | Each item, quantity, unit price | The client can see where the money goes — and compare like with like | | Subcontractors | Trade, scope, price | Proves specialist work is covered and priced | | Markup | Percentage and amount, shown openly | Your profit is legitimate; hiding it invites suspicion | | Permits & disposal | Permit fee, skip/dumpster, equipment hire | Costs clients forget exist — and blame you for later | | Tax | Tax line, or a note that no tax is charged | Business clients need it; see the tax note below | | Deposit | Amount and percentage due on acceptance | Commits the client and funds your material purchases | | Terms | Inclusions, exclusions, change-order pricing, payment schedule | The exclusions are what let you charge for extra work later | | Acceptance | Signature line or "reply to accept" | A quote with no clear way to say yes sits unanswered |

Worked example: a bathroom remodel quote

A general contractor in Texas quotes a residential bathroom remodel. Texas does not tax labour to repair, remodel, or restore residential real property, and on a lump-sum contract the contractor pays sales tax on materials at purchase — so this quote has no sales-tax line, and the materials are priced with the tax the contractor already paid built in. Check the maths yourself — every figure below is hand-computed:

| Description | Qty | Unit price | Amount | | --- | --- | --- | --- | | Demolition and disposal | 16 hrs | $65.00 | $1,040.00 | | Tiling — labour | 24 hrs | $70.00 | $1,680.00 | | Painting and finishing | 12 hrs | $60.00 | $720.00 | | Labour subtotal | | | $3,440.00 | | Plumbing rough-in (subcontractor) | 1 | $1,850.00 | $1,850.00 | | Electrical work (subcontractor) | 1 | $950.00 | $950.00 | | Subcontractor subtotal | | | $2,800.00 | | Fixtures and fittings | 1 | $2,400.00 | $2,400.00 | | Tile, adhesive and grout | 1 | $1,150.00 | $1,150.00 | | Vanity and mirror | 1 | $780.00 | $780.00 | | Paint and sundries | 1 | $320.00 | $320.00 | | Materials subtotal | | | $4,650.00 | | Building permit | 1 | $185.00 | $185.00 | | Direct costs | | | $11,075.00 | | Markup — overhead and profit (10%) | | | $1,107.50 | | Total | | | $12,182.50 | | Deposit due on acceptance (40%) | | | $4,873.00 | | Balance due on completion | | | $7,309.50 |

How the totals are reached: labour $1,040 + $1,680 + $720 = $3,440; subcontractors $1,850 + $950 = $2,800; materials $2,400 + $1,150 + $780 + $320 = $4,650; plus the $185 permit gives direct costs of $11,075. A 10% markup on direct costs is $11,075 × 0.10 = $1,107.50, so the total is $12,182.50. A 40% deposit is $12,182.50 × 0.40 = $4,873.00, leaving a balance of $7,309.50 on completion.

The quote also shows: quote number QT-2026-014, quote date 8 November 2026, valid until 22 November 2026 (14 days), the client's name and site address, and the terms — existing fixtures removed and disposed of, paint supplied by the contractor, tiles supplied by the client not included, and any work beyond the listed scope priced as a change order. If you work in a state that taxes construction services — Hawaii, New Mexico, South Dakota, and Washington are the main ones — add the applicable tax on the total and show it as its own line.

The change order: what happens when the client adds work

Mid-job, the client asks for underfloor heating in the bathroom. You do not absorb it and you do not argue about it — you issue a change order as a revised quote:

| Description | Qty | Unit price | Amount | | --- | --- | --- | --- | | Heated floor kit and installation | 1 | $1,450.00 | $1,450.00 | | Revised total | | | $13,632.50 |

The original total of $12,182.50 plus the $1,450.00 change order gives a revised total of $13,632.50. The client signs the revised quote before the extra work starts, and the invoice at the end matches the revised quote — not the original. Put the change-order rule in your terms from the start ("additional work is quoted separately and requires written approval before it begins") and this conversation never becomes an argument.

Sales tax on contractor quotes: the short version

Sales tax is the part of a contractor quote most often done wrong, because the rules change by state and by contract type:

This is general information, not tax advice. If you quote across state lines or in a state that taxes construction, confirm the current rules with your state's revenue department or your accountant before you send the quote.

Saving and sending the PDF

Once the quote looks right, download it as a PDF and send that — not a link to an editable document and not a screenshot. A PDF keeps your layout fixed, so the table, totals, and terms look the same on the client's phone as on your screen. Put the quote number and the total in the email subject line ("Quote QT-2026-014 — Bathroom remodel, $12,182.50"), so the client can find it again without searching. If the client does not reply, follow up once before the validity date runs out — a quote that gets no reply is usually not a no, it is a busy homeowner, and the expiry date gives you a natural reason to check in.

Generator vs template vs quoting software

| | Free quote generator | Document template | Paid quoting software | | --- | --- | --- | --- | | Cost | Free, no sign-up | Free | Monthly subscription, often $20–$100+/month | | Turnaround | Under 10 minutes | 20–30 minutes, longer with many lines | Minutes once configured, hours to set up | | Maths | Automatic — totals, markup, tax, deposit | By hand, error-prone | Automatic | | Materials & markup | Built for it | You build the rows yourself | Built for it, plus supplier price lists | | Change orders | Add a line, re-issue | Rebuild the document | Built in, with version history | | PDF export | One click, no watermark | Export from Docs or Word | One click | | Quote-to-invoice | Copy the details into our invoice generator | Retype everything | One click, often on a higher plan | | Tracking & follow-ups | No — follow up yourself | No | Yes — status, reminders, e-signatures | | Best for | Contractors sending a few quotes a week | One-off simple quotes | High-volume quoting teams |

The generator is the sweet spot for most independent contractors: it does the maths and the layout of paid software without the subscription, and it beats a template on every quote with more than a handful of lines. Software earns its keep when you send many quotes a week and need tracking, reminders, and e-signatures — until then, the free generator is enough.

Contractor quote mistakes to avoid

One lump sum instead of line items. A single total gives the client nothing to understand and everything to haggle over. Itemise labour, materials, and subcontractors separately.

Forgetting the markup. Quoting your costs without a markup is quoting at a loss once overheads are counted. Show the markup as its own line — 10–20% on direct costs is a common range — so the price is honest and sustainable.

No validity date. Material prices move, and a quote with no expiry is a promise to honour old prices indefinitely. 7–14 days is standard for contractor work.

Vague scope. "Bathroom remodel — $12,182.50" invites disputes about what was included. List every task and material, and list the exclusions too: what is not included is what lets you charge for extra work later.

No deposit on the quote. If you need materials before you start, say so on the quote: 30–50% upfront is normal for contractor work, and stating it after the client has accepted feels like a surprise.

Absorbing change orders. Extra work without a written change order is free work. Price every addition separately and get it signed before you start it.

Wrong tax treatment. Adding sales tax where your state does not charge it makes you look expensive; leaving it off where your state requires it leaves you paying it out of your own pocket. Check your state's rules — see the tax note above.

Sending the editable file. Send the PDF. An editable document can be changed, reformatted, or opened in a way that breaks your layout — and a client should not be able to edit your prices.

Frequently asked questions

Is this contractor quote generator really free?

Yes. There is no sign-up, no trial period, no limit on how many quotes you create, and no watermark on the PDF. Everything you type stays in your browser — nothing is sent to a server.

Do I need to create an account to save a quote as a PDF?

No. Open the quote generator, fill in the job, and download the PDF straight away. If you want to keep a copy for your records, save the PDF file yourself — the tool does not store your quotes.

What is the difference between a quote and an estimate for contractors?

A quote is a fixed-price commitment: once the client accepts it, that is the price, even if the work takes longer than expected. An estimate is a best guess that can move once the scope is confirmed — for example, when you cannot see what is behind a wall. Quote when you can see the whole job; estimate when something is still unknown, and say plainly what would change the price. Our quote vs estimate vs invoice guide covers the full distinction, including when each one locks you in.

How much deposit should I ask for on a contractor quote?

30–50% upfront is standard for contractor work, because you are buying materials before you start. The worked example above uses 40%. State the deposit as an amount in dollars on the quote itself, not just as a percentage, and say whether it is refundable if the client cancels. For how to invoice the deposit and the balance, see our guide to how to invoice for a deposit.

How long should a contractor quote be valid?

7–14 days is standard for contractor work — shorter than for other trades, because material prices move quickly. State the expiry date on the quote. If the client comes back after it lapses, issue a fresh quote rather than honouring the old price.

Do I charge sales tax on a contractor quote?

It depends on your state. In most states, on a lump-sum contract you pay sales tax on materials when you buy them and do not charge the client tax — the tax is already inside your material prices, as in the worked example. A few states tax construction services or labour, including Hawaii, New Mexico, South Dakota, and Washington. Check your state's revenue department guidance before you add a tax line, and see our US sales tax guide for the details.

Can I turn an accepted quote into an invoice?

Yes. Once the client accepts in writing, use our free invoice generator with the same line items, totals, and deposit terms — the invoice should bill exactly what the quote promised. If the scope changed after acceptance, agree the change in writing first and reference the revised quote number on the invoice.